Krishnakanth Park Lake Restoration: UPSC Facts

Krishnakanth Park lake restoration

Krishnakanth Park lake restoration aims to expand a water body in Hyderabad’s Yousufguda area. The project links urban water management and environmental concerns.

Quick answer: Krishnakanth Park lake restoration is a Hyderabad project announced in 2026 by the Hyderabad Disaster Response and Asset Development Agency. It proposes expanding three connected ponds from about 3 acres to a 12-acre lake. The ₹7.5 crore plan aims to retain stormwater and includes a new sewage treatment plant.

Important for
Prelims
Urban lakes and sewage treatment
Mains
GS Paper III: Environment and disaster management
Location
Yousufguda, Hyderabad
Existing water area
About 3 acres
Proposed lake
12 acres
Plan cost
₹7.5 crore

Where is the lake and what are its features?

The lake lies inside Krishnakanth Park in Yousufguda, Hyderabad, Telangana. Currently, its three ponds connect through canals; the restoration plan proposes merging them into one lake.

Feature Key fact
Park area 22 acres
Current water bodies Three connected ponds, covering about 3 acres
Proposed water area 12 acres, or four times the existing area
Park launch 2004

The ponds were built during the park’s development. Moreover, the lake has filled seasonally, generally drying in summer and filling after the monsoon.

Why is Krishnakanth Park lake restoration in the news?

The Hyderabad Disaster Response and Asset Development Agency (HYDRAA) has announced a ₹7.5 crore development plan. Its commissioner, A.V. Ranganath, says the expanded lake will impound stormwater that inundates Ameerpet and nearby downstream localities during rain.

The plan also includes a new sewage treatment plant (STP). Its proposed capacity is 1–2 million litres per day (MLD), with treated water intended for the expanded lake.

What happened to the earlier sewage treatment plant?

An earlier STP was established in 2003–04 to supply treated water to the park’s ponds. According to engineers who worked on the park, it had a capacity of 0.6 MLD and used filtration, aeration and sedimentation.

However, the plant remained defunct for much of its existence because of inadequate maintenance. A Central Pollution Control Board report listed it as non-operational in 2021.

Its former location now falls within a garbage transfer station. The station operator, however, denied that an STP existed within the facility. The article found no information from the Greater Hyderabad Municipal Corporation about decommissioning the earlier plant.

Why does the project matter?

The project connects stormwater storage with sewage treatment and the use of urban green space. An expanded lake can retain runoff; however, the plan will reduce space available for existing park facilities.

Work on trees has begun: 34 trees were marked for felling and 156 for translocation. In addition, sewage now flows through a drain in the park, although it does not enter the lake.

Source: The Hindu, 10 November 2026

Punjab & Haryana PCS Angle

State PCS General Studies may test urban lakes, stormwater drainage and sewage treatment together. Therefore, revise how municipal bodies manage local water bodies and urban services.

Prelims Practice Corner

Q1. Consider the following statements about Krishnakanth Park:
1. It is located in Yousufguda, Hyderabad.
2. Its existing water body comprises three ponds connected by canals.
Which of the statements given above is/are correct?

(a) 1 only
(b) 2 only
(c) Both 1 and 2
(d) Neither 1 nor 2

Show answer

Answer: (c). Both are correct because the park lies in Yousufguda and has three interconnected ponds.

Q2. Consider the following statements about the proposed lake project:
1. It plans to expand the water area from about 3 acres to 12 acres.
2. It aims to retain stormwater affecting Ameerpet and nearby localities.
3. It proposes a new sewage treatment plant of 0.6 MLD.
How many of the statements given above are correct?

(a) Only one
(b) Only two
(c) All three
(d) None

Show answer

Answer: (b). Statements 1 and 2 are correct because the proposed plant has a capacity of 1–2 MLD, not 0.6 MLD.

More practice questions

Q3. Consider the following pairs:
1. Earlier sewage treatment plant: 0.6 MLD
2. Proposed sewage treatment plant: 1–2 MLD
3. Trees marked for translocation: 34
How many pairs given above are correctly matched?

(a) Only one
(b) Only two
(c) All three
(d) None

Show answer

Answer: (b). The first two pairs are correct because 156 trees, not 34, were marked for translocation.

Q4. Consider the following statements about the earlier sewage treatment plant:
1. It was established in 2003–04.
2. A Central Pollution Control Board report listed it as non-operational in 2021.
Which of the statements given above is/are correct?

(a) 1 only
(b) 2 only
(c) Both 1 and 2
(d) Neither 1 nor 2

Show answer

Answer: (c). Both are correct because the plant dates to 2003–04 and was listed as non-operational in 2021.

Mains Practice Questions

Q1. Discuss how urban lake restoration can support stormwater management while addressing sewage and green-space concerns. (10 marks, GS Paper III)

Answer Structure

Intro: Introduce the planned expansion at Krishnakanth Park.

Body: Cover stormwater storage, sewage treatment, plant maintenance and effects on park trees and facilities.

Conclusion: Emphasise integrated planning and sustained maintenance.

Frequently Asked Questions

Where is Krishnakanth Park lake?

It is in Yousufguda, Hyderabad, Telangana. Currently, three ponds connected by canals cover about 3 acres.

How large will the proposed lake be?

The proposed lake will cover 12 acres. Thus, its planned area is four times the existing water area of about 3 acres.

What is the capacity of the proposed sewage treatment plant?

The proposed plant will treat 1–2 million litres per day. In contrast, the earlier plant had a capacity of 0.6 million litres per day.

Preparing for UPSC, PCS or HCS?

Talk to a mentor at Chetan Bharat Learning, Chandigarh. Free guidance on choosing the right exam and building a study plan.

Chat on WhatsAppCall 97793 53345

UPSC / IAS / PCS coaching in Chandigarh · Trusted by aspirants across Punjab & Haryana

No comments to show.

Leave a Reply

Chetan Bharat Learning
Chetan Bharat LearningUPSC · PCS · HCS coaching, Chandigarh
Call / WhatsApp 97793-53345 · currentaffairs.chetanbharat.com
Prepared by Chetan Bharat Learning
New UPSC batches start 12, 13 & 16 November · Classroom, Live Online & Recorded
Call / WhatsApp 97793-53345 · ISBT 43, First Floor, Sector 43, Chandigarh
Free Mains answer evaluation: currentaffairs.chetanbharat.com/mains-answer-evaluation/
Source: https://currentaffairs.chetanbharat.com/krishnakanth-park-lake-restoration-upsc/
WhatsApp us Free answer check